翻訳と辞書
Words near each other
・ Bangladesh at the 2010 Summer Youth Olympics
・ Bangladesh at the 2011 Commonwealth Youth Games
・ Bangladesh at the 2011 South Asian Winter Games
・ Bangladesh at the 2011 World Aquatics Championships
・ Bangladesh at the 2011 World Championships in Athletics
・ Bangladesh at the 2012 Summer Olympics
・ Bangladesh at the 2013 Asian Youth Games
・ Bangkok Conference
・ Bangkok Corrections Museum
・ Bangkok Dangerous
・ Bangkok Dangerous (1999 film)
・ Bangkok Dangerous (2008 film)
・ Bangkok Declaration
・ Bangkok Doll Museum
・ Bangkok Dusit Medical Services
Bangkok Elevated Road and Train System
・ Bangkok F.C.
・ Bangkok Fashion City
・ Bangkok Fashion Trend Center
・ Bangkok Folk Museum
・ Bangkok Futsal Club
・ Bangkok Girl
・ Bangkok Glass F.C.
・ Bangkok Glass Futsal Club
・ Bangkok Glass VC
・ Bangkok Grace International School
・ Bangkok gubernatorial election, 2004
・ Bangkok gubernatorial election, 2008
・ Bangkok gubernatorial election, 2009
・ Bangkok gubernatorial election, 2013


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Bangkok Elevated Road and Train System : ウィキペディア英語版
Bangkok Elevated Road and Train System

The Bangkok Elevated Road and Train System (BERTS, Thai: โครงการระบบการขนส่งทางรถไฟยกระดับในกรุงเทพมหานคร), commonly known as the Hopewell Project (โครงการโฮปเวลล์) after main contractor Hopewell Holdings, was a failed project to build an elevated highway and rail line from central Bangkok to Don Mueang International Airport. Construction started in 1990, but was suspended by the 1st government of Anand Panyarachun in 1992, and was finally halted by legal acrimony in 1997 with only 10-13% complete. The project was cancelled in 1998.〔http://2bangkok.com/2bangkok/MassTransit/HopewellMain.shtml〕 Due to its resemblance to standing stones, it has been comically nicknamed "Thailand's Stonehenge".
==History==
The 80 billion baht (US$3.2 billion) project was approved on 9 November 1990, without a feasibility study or clear timeline for completion,〔"Thais Revisit a Troubled Mass-Transit Project", International Herald Tribune, October 10, 1998. ''Mr. Wu's Hopewell Holdings Ltd. received approval for the project in 1990 without conducting a feasibility study. It began construction before securing ownership of land along the route. Without any clear timetable for completion, Mr. Wu had running public disputes with officials over the speed of construction. Last year, with less than 10 percent of the project completed, the government canceled Hopewell's contract. Thai officials said Mr. Wu had run out of money, while he blamed government instability for slowing land acquisition. Since 1990, Thailand has had one coup and an average of a government a year--besides numerous leadership changes at the Ministry of Transport and Communication. Mr. Wu is threatening to sue the government for breach of contract, and Mr. Akapol said the government would seek compensation for incomplete work.''〕 as a joint project of the Thai Ministry of Transport, State Railway of Thailand (SRT) and the Thai subsidiary of Hopewell Holdings of Hong Kong.〔"Studying the '7-Generation Project'"(translated from Thai), Matichon, June 7, 2001. ''The Hopewell Project was signed by MOTC (Mr. Montri Phongphanit), SRT and Hopewell (Thailand) Co.Ltd. (Mr. Gordon Woo) on November 9, 1990 during the tenure of the late Montri Phong Phanit (Minister of MOTC), amid controversial rumours of corruption and unusual land deals. Hopewell had to find financial resources (about 80 billion baht - then US$ 3.2 billion) to back up the project for the right to develop real estate along the SRT lines. However, there were so many obstacles to deal with--including blueprints, land transfers, the routes which go parallel to other projects, and a financial crunch--that the project bogged down. There were also many committees dealing with the Hopewell project.... After September 1997, Mr. Suwat Liptaphallop (MOTC Minister during the Gen. Chawalit Yopngjaiyut government) sent the issue of the project delay to the cabinet and Mr. Suthep Thueaksubun decided to terminate the project in 1998. Even though several groups offered to revive it, controversies still haunt the project, earning it the nickname "the 7-generation project."〕 There were to be three phases: the first a north-south line from Hua Lamphong Railway Station, Bangkok's main train station, to Don Mueang International Airport; the second an east-west line from Taling Chan District to Hua Mak; and the third a spur to the port.〔 Totaling 60 km, all three were to be built on top of existing SRT train lines.
Rumors of corruption swirled around the project from the outset.〔 The first part of the project was due to be in operation by December 1995, with the rest completed by December 1999.〔 However, construction ceased in August 1997 during the Asian financial crisis, with only around 10% complete.〔 Gordon Wu of Hopewell blamed slow land acquisition on the Thai government, while Thai officials stated that Hopewell had simply run out of money.〔 Both sides demanded financial compensation and threatened to sue the other for breach of contract,〔 with Hopewell claiming the work had cost it US$575 million.〔 The project was formally terminated by the Cabinet in 1998.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Bangkok Elevated Road and Train System」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.